top of page
Search
  • americanallstarsea

DO I NEED TO PATCH CRACKS OR HOLES BEFORE SEALING?

Yes, large holes and cracks will get worse over time. Sealers are not intended to repair imperfections.


If you're considering Sealcoating your asphalt, repairing asphalt cracks and holes first would be your best choice, sealcoating is not designed to be an asphalt crack filler, it is made for sealing the surface and protecting it from the elements such as UV light, salts, oils, etc.



7 views0 comments

Recent Posts

See All

Why is it suggested to apply two coats of sealer?

Applying two coats of any sealer will dry and create a better finish much better than one thick coat. These sealers are water based, and they cure and form a film primarily during the evaporation of w

HOW SOON AFTER SEALING CAN I DRIVE ON THE ASPHALT?

Most of the time you can drive on your driveway 24-48 hours after the coat is finished. There are a few issues to note that affect dry time: 1.    Shaded areas will take longer than areas in direct su

Maintenance after your sealcoat service.

Keep cars off the surface freshly seal coated for atleast 24-48hrs. Keep foot traffic off the surface gor up to 24hrs. Clean any stains immediately! Use a degreaser to remove oil stains, for all other

bottom of page